Public Projects
-
Sewer and Water
-
City of Abbotsford
- Cole Road Watermain Replacement Project, Vye Road to Wells Line Road, Design and Contract Administration of 1610 meters of 200 mm diameter watermain, City of Abbotsford, 2003
- Marshall Road between McCallum Road and Vinewood Street & Horizon Street between McCallum Road and Hawthorne Avenue Watermain Replacement Project, Design and Contract Administration of 1250 meters of 200 mm diameter watermain (includes pipe bursting of 200 meters of 300 mm waterline), , City of Abbotsford, 2003
- Simpson Road Trunk Sewer Replacement Project (at Ross Road), Design and Contract Administration of 185 meters of 600 mm diameter sanitary trunk sewer, City of Abbotsford, 2003
- Huntingdon Trunk Sewer, Stage IV, Design and Contract Administration of 1 km of 600 mm diameter, gravity trunk sewer by Directional Drilling, City of Abbotsford, 1999-2002
- Cole Road Watermain Replacement Project, Vye Road to Wells Line Road, Design and Contract Administration of 1610 meters of 200 mm diameter watermain, City of Abbotsford, 2003
-
City of Pitt Meadows
-
City of Port Coquitlam
- 2007 Watermain Replacement Program, Design and Contract Administration reconstruction of approximately 1500 meters of watermain within 2007 Road Rehabilitation Program Limits City of Port Coquitlam, 2007
- Kelly Sanitary Trunk Sewer Replacement, Design and contract administration of sewer replacement of 500 meters of 750 mm diameter sanitary trunk sewer, 2007.
- 2006 Watermain Replacement Program, Design and Contract Administration reconstruction of approximately 1720 meters of watermain within 2006 Road Rehabilitation Program Limits City of Port Coquitlam, 2006
- 2005 Watermain Replacement Program, Design and Contract Administration reconstruction of approximately 750 meters of watermain within 2005 Road Rehabilitation Program Limits City of Port Coquitlam, 2005
- Saskatchewan Avenue Watermain Replacement, design and contract administration services for the replacement of approximately 250 meters of existing 400 mm ductile iron watermain, City of Port Coquitlam, 2005
- 2004 Watermain Replacement Program, reconstruction of approximately 955 meters of watermain and 1195 meters of Sanitary Sewers under the 2003 Watermain and Sanitary Mains Replacement Program. City of Port Coquitlam, 2004
- 2003 Water and Sanitary Mains Replacement Program Design Of Utilities, Design and Contract Administration of 955 meters of watermain and 1195 meters of Sanitary Sewers under the 2003 Watermain and Sanitary Mains Replacement Program , City of Port Coquitlam, 2003.
- 2003 Watermain Replacement Program, Design of 1445 meters of 200 mm diameter watermain, City of Port Coquitlam, 2002 -03.
- Kelly Avenue – Trunk Sewer Upgrade And Replacement Project -Kingsway To Mary Hill, City of Port Coquitlam, 2002
- Tyner / Kingsway Sewer Replacement, predesign and assessment of replacement alternatives for 650 meters of 675 mm diameter Sanitary Trunk Main (off line excavation, pipe bursting, directional drilling, and CIPP relining), City of Port Coquitlam, 1999
- 2007 Watermain Replacement Program, Design and Contract Administration reconstruction of approximately 1500 meters of watermain within 2007 Road Rehabilitation Program Limits City of Port Coquitlam, 2007
-
City of Port Moody
- 2007 Infrastructure Improvement Program, reconstruction of approximately 400 metres of watermain on Garrow and Foress Drive, City of Port Moody, 2007
- 2007 Infrastructure Improvement Program, reconstruction of approximately 400 meters of watermain on Weldon Court, City of Port Moody, 2007
- Clarke Storm Inlet Design, Design of inlet structure modifications to existing storm sewer, City of Port Moody, 2005.
- Mercier Storm Sewer Extension, Design of 200 meters of 200 mm diameter storm sewer, City of Port Moody, 2005.
- 2007 Infrastructure Improvement Program, reconstruction of approximately 400 metres of watermain on Garrow and Foress Drive, City of Port Moody, 2007
-
City of Richmond
City of Richmond, Sanitary Sewer Installation Programme (2002), , City of Richmond, 2002
-
City of Surrey
- 2008 Water Works Package W53/08 – 124 Street: 90 to 96 Avenue and 96 Avenue: 121 to 124 Street Watermain Installation, Design of 1200 metres of 750 mm and 600 meters of 600 mm watermain installation, 2008 to 2010 - $Construction Value $3,300,000
- 2007 Watermain Replacements – Design Package W51/07, Design of 100 mm, 150 mm, 200, mm, 300 mm, and 750 mm watermain replacements at 10 locations, City of Surrey, 2007.
- Port Kells Sanitary Forcemain Replacement, predesign report for the Port Kells Sanitary Forcemain Replacement at 98 Avenue from 190 Street to 186 Street (~900 metres of new 450 mm diameter forcemain)., City of Surrey, 2007.
- 2007 Tannery Watermain Project, W51-07 Design of Timberland Road watermain replacement between address 10631 to Tannery Road (~280 metres of new 450 mm diameter watermain).
- Waterworks Package W52-06, Design of watermain extensions on 192 Street from 52 Avenue to 40 Avenue, 152 Street: 40 Avenue to 44 Avenue, and 168 Street: 40 Avenue to 48 Avenue, City of Surrey, 2007.
- Design & Construction Package S51/05 Design of relief capacity upgrading for various sewer sections, City of Surrey, 2005.
- 2008 Water Works Package W53/08 – 124 Street: 90 to 96 Avenue and 96 Avenue: 121 to 124 Street Watermain Installation, Design of 1200 metres of 750 mm and 600 meters of 600 mm watermain installation, 2008 to 2010 - $Construction Value $3,300,000
-
District of Maple Ridge
- 2007 Trenchless Watermain Replacement Program Design and Contract Administration of 55 metres of 1500 mm and 250 mm diameter watermain, District of Maple Ridge, 2007
- 2004 Trenchless Watermain Replacement Program, Design of 200 meters of 200 mm and 300 mm diameter watermain, District of Maple Ridge, 2004
- 2000 Watermain Replacement, Design of 500 meters of 200 mm diameter watermain, District of Maple Ridge, 2000
- 2007 Trenchless Watermain Replacement Program Design and Contract Administration of 55 metres of 1500 mm and 250 mm diameter watermain, District of Maple Ridge, 2007
-
Resort Municipality of Whistler
Crabapple Drive Forcemain Replacement, Resort Municipality of Whistler, 1999
-
-
Pumping Facilities
-
City of Abbotsford
- King Road Sanitary Lift Station Upgrading Project. Civil and mechanical design work for upgrading to King Road Lift Station, 24.6 l/s pump station, City of Abbotsford, 1997
- Sanitary Lift Station Evaluation Study, (assess and evaluate 14 Sanitary Lift Stations – 10 l/s to 102 l/s), City of Abbotsford, 1996
- King Road Sanitary Lift Station Upgrading Project. Civil and mechanical design work for upgrading to King Road Lift Station, 24.6 l/s pump station, City of Abbotsford, 1997
-
City of Port Coquitlam
- Broadway Sanitary Pump Station, 30 l/s pump station, City of Port Coquitlam, 2007
- Brand Sanitary Pump Station, 35 l/s pump station, City of Port Coquitlam, 2006
- Works Yard Sanitary Pump Station, 8.5 l/s pump station, City of Port Coquitlam, 2004
- Lynwood Sanitary Pump Station, 18.5 l/s pump station, City of Port Coquitlam, 2004
- Hyde Creek Park Sanitary Pump Station, design and contract administration of pump station upgrade (18.3 l/s Flygt 10 Hp NP 3127 HT pumps), City of Port Coquitlam 2003
- Broadway Sanitary Pump Station, 30 l/s pump station, City of Port Coquitlam, 2007
-
City of Port Moody
- North Road PRV Station Upgrading, predesign of the North Road PRV Station Upgrading, City of Port Moody, 2007
- Cecile Drive Water System Improvements, predesign of the Cecile Drive Water System Improvements City of Port Moody, 2007
- Westhill Youth Centre Pump Station Upgrading, 5 l/s pump station, City of Port Moody, 2006
- Alderside Lift Station Upgrading – predesign assessment, City of Port Moody , 2005
- North Road PRV Station Upgrading, predesign of the North Road PRV Station Upgrading, City of Port Moody, 2007
-
District of Chilliwack
- Chilliwack Mountain Booster Pump Upgrading, analysis, design and pump selection for 18.5 l/s City of Chilliwack, 2006
- Design of 110 l/s Submersible Vertical Turbine Well Pump, Well No. 7 on Watson Road, District of Chilliwack, 1999
- Chilliwack Mountain Booster Pump Upgrading, analysis, design and pump selection for 18.5 l/s City of Chilliwack, 2006
-
District of Maple Ridge
- 300 / 440 Zone Water Pump Station Upgrading Study, 190 / 435 l/s booster pumps and 7.5 ML reservoir, District of Maple Ridge, 1998
- Fairgrounds Sanitary Pump Station forcemain and gravity sewermains design of sanitary 11.0 l/s pump station, forcemain, and gravity sewers, District of Maple Ridge, 1998.
- 300 / 440 Zone Water Pump Station Upgrading Study, 190 / 435 l/s booster pumps and 7.5 ML reservoir, District of Maple Ridge, 1998
-
District of Mission
- Penitentiary Sanitary Lift Station Upgrading, capacity analysis of the Mission Penitentiary Pump Station, District of Mission. 2007
- Mission Way Sanitary Lift Station, mechanical upgrade design and contract administration, District of Mission, 2003-2005.
- Harbour and Penitentiary Sanitary Lift Station Upgrading, 2 pump stations 25 and 35 l/s, District of Mission. 1999
- Penitentiary Sanitary Lift Station Upgrading, capacity analysis of the Mission Penitentiary Pump Station, District of Mission. 2007
-
Resort Municipality of Whistler
- Nicklaus North Sanitary Pump Station, capacity analysis of the Nicklaus North Sanitary Pump Station S-123 located at 8407 Golden Bear Place in Nicklaus North., Resort Municipality of Whistler, 2007
- Sanitary Pump Station S-106 Upgrading, 60 l/s pump station, Resort Municipality of Whistler, 2007
- Sanitary Pump Station S-111 Upgrading, 2.5 l/s pump station, Resort Municipality of Whistler, 2005- 2006
- Firehall No. 2 Sanitary Pump Station, Design of sanitary pump station for proposed Fire Hall, 2004
- Landfill Leachate Pump Station, Investigation, Predesign for design of replacement leachate pump station, Resort Municipality of Whistler, 2004
- Alternate Irrigation Systems, Investigation, Predesign Design, and contract administration for well pumps for sports field irrigation, Resort Municipality of Whistler, 2003.
- Meadow Park Well Development, Resort Municipality of Whistler, 2002
- Sanitary Pump Station S-101 Reconstruction, 70 l/s pump station including building, Resort Municipality of Whistler, 2001-02
- Sanitary Pump Station S-103 Reconstruction, 90 l/s pump station including building, Resort Municipality of Whistler, 2000
- Sanitary Pump Station S-107 Upgrading, 7.5 l/s pump station, Resort Municipality of Whistler, 2000
- Sanitary Pump Station S-112 Upgrading, 5 l/s pump station, Resort Municipality of Whistler, 1999
- Site services, new sanitary pump station for Lost Lake Park washroom facility, Resort Municipality of Whistler, 1998.
- Sanitary Pump Station S-104 Upgrading, 11.6 l/s pump station, Resort Municipality of Whistler, 1998
- Sanitary Lift Station Assessment and Evaluation, assess, evaluate, and recommend rehabilitation strategies for 6 sanitary pump stations 5 l/s to 90 l/s; Resort Municipality of Whistler, 1997
- Nicklaus North Sanitary Pump Station, capacity analysis of the Nicklaus North Sanitary Pump Station S-123 located at 8407 Golden Bear Place in Nicklaus North., Resort Municipality of Whistler, 2007
-
Village of Harrison Hot Springs
Intake Pump Station and Chlorination and Booster Pump Station, Design Build (P. Baratta Construction Ltd.), Village of Harrison Hot Springs, 2000
-
-
Infrastructure Renewal & Trenchless Technology
-
City of Abbotsford
- Blue Jay Road Trunk Sewer Upgrading Project, Design and Contract Administration of 275 meters of 600 mm diameter sanitary trunk sewer (installed by HDD), City of Abbotsford, 2003
- Marshall Road / Horizon Street Watermain Replacement Project, Design and Contract Administration of pipe bursting of 200 meters of 300 mm waterline), , City of Abbotsford, 2003
- Huntingdon Trunk Sewer, Stage IV, Design and Contract Administration of 1 km of 600 mm diameter, gravity trunk sewer by Directional Drilling, City of Abbotsford, 1999-2002
- City of Abbotsford, assess and evaluate 2000 CCTV Inspection program including Contract Administration of 2000 CCTV inspection program.
- Old Downtown Abbotsford Area Infrastructure Study, Assessment & Evaluation Roads, Sewers, Watermains, 1996
- Blue Jay Road Trunk Sewer Upgrading Project, Design and Contract Administration of 275 meters of 600 mm diameter sanitary trunk sewer (installed by HDD), City of Abbotsford, 2003
-
City of Burnaby
- Inspection Services Contract 2007-18, 2007 Sanitary Sewer Trenchless Point Repairs, and Contract 2007-19, 2007 Sanitary Sewer Grouting, 2007
- Graveley Storm sewer, predesign, design, and Contract Administration of construction of 130 meters of 200 mm storm sewer by horizontal directional drilling, 2004-2005.
- Marine Drive Storm Renewal, design and Contract Administration of internal reconstruction of 130 meters of 525 mm storm sewer by pipe bursting, 2004
- Inspection Services Contract 2007-18, 2007 Sanitary Sewer Trenchless Point Repairs, and Contract 2007-19, 2007 Sanitary Sewer Grouting, 2007
-
City of Coquitlam
- Coquitlam School District – James Park Elementary School Upgrading Civil Work, Design of Offsite and Onsite Roadworks and Watermains, 2010 -11; Construction Value Civil Works $750,000.00
- Rochester Ravine Rehabilitation Program, Design Investigation, Predesign Design, and contract administration for rehabilitation of 550 meters of 1200 mm diameter storm sewer including redesign of inlet structure, 2005.
- Nelson Avenue Culvert Rehabilitation Program, Investigation and design for rehabilitation of 80 meters of 900 mm diameter storm sewer including redesign of outlet structure, 2004
-
Corporation of Delta
- 2007 Storm Outfall Rehabilitation,Design and Contract Administration of internal reconstruction of 100 metres of 250 mm, 95 metres of 375 mm, and 165 metres of 900 mm storm sewers on Collings Way, Nelson View, and 112 Street,2007.
- South Delta Sanitary & Drainage Rehabilitation, design and contract administration of 445 metres of internal reconstruction of sanitary and drainage sewers at various locations, 2007.
- Blake Ravine Storm Sewer Rehabilitation, Internal replacement of an existing 1800 mm diameter CMP storm drain, including assessment of options for replacement and implementation of 90 meters Sliplining using Lamson Vylon, 2005.
- Oak Place Pump Station Trunk Sewer Rehabilitation, Inspection, assessment, and evaluation of 680 metres of 600 mm to 750 mm diameter storm sewer main, Corporation of Delta, 2005.
- Sanitary Sewer Renewal Program, assess, evaluate, design and contract administration (CCTV Inspection, internal reconstruction, internal point repairs, and joint sealing), 2003-2005.
- 2007 Storm Outfall Rehabilitation,Design and Contract Administration of internal reconstruction of 100 metres of 250 mm, 95 metres of 375 mm, and 165 metres of 900 mm storm sewers on Collings Way, Nelson View, and 112 Street,2007.
-
City of Nanaimo
Sewer Assessment and Evaluation assess, evaluate, and recommend rehabilitation strategies for various sections of deteriorated sewers, 1996;
-
City of New Westminster
- Sanitary Sewer Inspection Program, review, and contract administration for CCTV Inspection contract, 2002, 2004-, and 2006-2007.
- Sanitary Sewer Renewal Program, assess, evaluate, design and contract administration (internal reconstruction, pipe bursting, internal point repairs, and joint sealing), 1996- 2001, 2003-2004, 2006
- Sanitary Sewer Service Renewal Program, design and Contract Administration of internal replacement of sanitary sewer services, 2005-07
- Sanitary Sewer Inspection Program, review, and contract administration for CCTV Inspection contract, 2002, 2004-, and 2006-2007.
-
City of Port Coquitlam
- Sanitary Sewer Smoke Testing Program, design and contract administration of 15,000 metres of smoke testing (Citadel Catchment Area), 2007.
- Sanitary Sewer Smoke Testing Program, design and contract administration of 21,000 meters of smoke testing (Cedar Drive Catchment Area), 2007.
- Sanitary and Sewer Program,assess and evaluate condition of 15,000 metres of Sanitary and Storm Sewers, 1996 - 2007
- Tyner. Kingsway Mclean Trunk Sanitary Sewer Replacement, design and contract administration of sewer replacement of 700 meters of 750 mm diameter sanitary trunk sewer by pipe bursting, 2006.
- Sanitary Sewer Services Renewal, design and Contract Administration of internal reconstruction of sanitary sewer services within annual road rehabilitation areas, 2003 – 2006.
- Sanitary Sewer Renewal Program, (internal reconstruction, pipe bursting, internal point repairs, and joint sealing), 1996 – 2006.
- Pitt River Road Sanitary Sewer Services Renewal, design and Contract Administration of internal reconstruction of sanitary sewer services, 2004-2005.
- Sanitary Sewer Smoke Testing Program, design and contract administration of 7,000 meters of smoke testing (Burleigh Siphon Catchment Area), 2005.
- Sanitary Sewer Smoke Testing Program, design and contract administration of 14,000 meters of smoke testing (2003 smoke testing program), 2004.
- Kelly Avenue Trunk Sanitary Sewer Replacement, project included and evaluation and comparison of sewer replacement using trenchless technologies as compared to traditional open cut and replacement and design of replacement of 700 meters of 750 mm diameter sanitary trunk sewer, 2002.
- Sanitary Sewer Replacement, project included replacement of existing sewers by Pipe Bursting (320 meters of 100 and 150 mm diameter sanitary sewer), 2001.
- Sanitary Sewer Smoke Testing Program, design and contract administration of 15,000 metres of smoke testing (Citadel Catchment Area), 2007.
-
City of Port Moody
- Contract 2007-47 – Storm Sewer Upgrading, design and contract administration of 30 metres of 450 mm diameter pipe by sliplining, including grouting of annular space inside an existing corrugated steel and wood stave culvert located at Mile 2.1 Ioco Spur (opposite 1208 Alderside Road, City of Port Moody and Canadian Pacific Railway, 2007
- Sanitary Sewer Renewal Program, design and contract administration (internal reconstruction, internal point repairs, and joint sealing), 2006
- Seaview – Clarke Storm Sewer Renewal, design and contract administration (internal reconstruction of 150 metres of 450 / 600 mm storm sewer), 2006
- Contract 2007-47 – Storm Sewer Upgrading, design and contract administration of 30 metres of 450 mm diameter pipe by sliplining, including grouting of annular space inside an existing corrugated steel and wood stave culvert located at Mile 2.1 Ioco Spur (opposite 1208 Alderside Road, City of Port Moody and Canadian Pacific Railway, 2007
-
City of Prince Rupert
City Prince Rupert, Internal replacement of 238 meters of deteriorated 200 mm diameter sanitary sewer pipe using Directional Drilling, 1996
-
City of Quesnel
Pavement Management Study, Assessment & Evaluation of 20 km Collectors, 3.5 km Commercial and 3.5 km Industrial Roads, Terra Engineering Ltd., 1997
-
City of Surrey
North Surrey Sanitary Sewer Service Lateral Renewal Program, design and Contract Administration of reconstruction of sanitary sewer services, 2004
-
District of Chilliwack
Storm Sewer Assessment and Evaluation, assess and evaluate 88 km of Storm Sewer, recommend and cost strategies, 1996
-
District of Maple Ridge
- 2007 Sanitary Sewer Relining Projects, Design of 340 metres of 200 mm, 300 mm, and 450 mm diameter watermain, District of Maple Ridge, 2007
- 2004 Sanitary Sewer Relining, predesign, design, and contract administration of 420 meters of sanitary sewer relining 2004
- 2004 Watermain Improvements, predesign, design, and contract administration of 885 meters of watermain construction / reconstruction (300 meters open cut, 260 meters pipe bursting, and 325 meters by pipe jacking or horizontal directional drilling) 2004
- 2007 Sanitary Sewer Relining Projects, Design of 340 metres of 200 mm, 300 mm, and 450 mm diameter watermain, District of Maple Ridge, 2007
-
District of Powell River
- Sanitary Sewer Assessment and Evaluation (assess and evaluate 77 kms of Sanitary Sewer, recommend and cost strategies, 1998
- Metro Vancouver
- Metro Vancouver, design and technical specifications for sliplining (included segmental PVC and HDPE options) of 600 meters of 500 mm diameter Robson Outfall concrete sanitary sewer, 2002
- Metro Vancouver, design, and technical specifications for segmental PVC sliplining of 150 meters of 1000 mm diameter Willingdon Outfall concrete storm sewer, 2001-2002.
- Sanitary Sewer Assessment and Evaluation (assess and evaluate 77 kms of Sanitary Sewer, recommend and cost strategies, 1998
-
Resort Municipality of Whistler
- Inflow and Infiltration Reduction Program, design and contract administration (internal reconstruction, internal point repairs, and joint testing and sealing), 2005 , 2006
- Blueberry Connector, predesign for pipe bursting of 900 meters of 250 mm (to 350 mm) diameter ductile iron watermain, 2002
- Spruce Grove Park Watermain Replacement, including 500 meters Pipe Bursting & Directional Drilling Resort Municipality of Whistler, 2001.
- Resort Municipality of Whistler, Assessment & Evaluation of 7000 meters of 600 – 750 mm diameter gravity trunk sanitary sewer including Design and Contract Administration of trunk sewer rehabilitation, 2001
- Resort Municipality of Whistler, Inflow and Infiltration Reduction Study of 2000 meters of 600 mm diameter gravity trunk sanitary sewer, 2000.
- Resort Municipality of Whistler, Inflow and Infiltration Reduction Study of 2000 meters of 600 mm diameter gravity trunk sanitary sewer, 2000.
- assessment and design review of in place pipe liner, 1999
- Resort Municipality of Whistler, Installation of 55 meters of 200 mm diameter gravity sanitary sewer for creek crossing using directional drilling, 1998
- Inflow and Infiltration Reduction Program, design and contract administration (internal reconstruction, internal point repairs, and joint testing and sealing), 2005 , 2006
-
Town of Creston
Sanitary Sewer Infiltration and Inflow Predesign Study, 1999
-
Township of Esquimalt
Head Street Sanitary Sewer Assessment, 1998
-
-
Roadworks & Miscellaneous
-
City of Port Coquitlam
- Annual Pavement Rehabilitation Programs, Design and Contract Administration for resurfacing of approximately 3,000 metres of road under the 2003 Road Rehabilitation Program, using Cold-In-Place (CIP), and mill and overlay (M&O) methodologies, 2003 – 2007, 2009-2011, Annual Construction Value $1,500,000 to $3,000,000
- Lougheed Highway Pavement Assessment & Evaluation, 600 meters east of Ottawa Street to Westwood Street, 2001.
-
City of Port Moody
Traffic Calming, design of curb extensions for traffic calming on April Road and Noon's Creek, Drive, 2006.
-
City of White Rock
Road and Sidewalk Construction (design of walks and sidewalk improvements), City of White Rock, 1996
-
District of Pitt Meadows
2003 Capital Works Program, Design and Contract Administration for 770 meters of 7 meter wide gravel road paving, 800 meters of Full Depth Reclamation, 1000 meters of asphalt mill and overlay 2003 District of Pitt Meadows, 1998 Capital Works- Pavement, Sanitary and Watermain Reconstruction, District of Pitt Meadows, 1998
-
Ministry of Transportation
Ministry of Transportation, Design of Deceleration Lane on Haney Bypass at access to Northview log Sort Facility, 2005.
-
-
Feasibility Assessment & Miscellaneous
-
City of Abbotsford
- Huntingdon Trunk Sewer, Stage III, Referee Services, Review of construction claim and recommendations for settlement, City of Abbotsford, 2001.
- Construction Management, Matsqui Village Sanitary Sewerage System including 20 l/s pump station, 1995
- Huntingdon Trunk Sewer, Stage III, Referee Services, Review of construction claim and recommendations for settlement, City of Abbotsford, 2001.
-
City of Port Coquitlam
Budget Input, Budget input and predesign cost estimates for proposed Capital Works Program 2003, 2004
-
Resort Municipality of Whistler
- Budget Input, Budget input and predesign cost estimates for proposed Capital Works Program 2003, 2004
- Municipal Servicing Options for Proposed New Washroom Facilities identify civil requirements; identify scope and limit of proposed civil works; confirm record information with the Municipality; investigate alternative servicing options, and outline additional requirements of the Municipality 2001
- Budget Input, Budget input and predesign cost estimates for proposed Capital Works Program 2003, 2004
-
Private Projects
-
Feasibility Assessment
- British Columbia Buildings Corporation, site servicing concepts and proforma for offsite and onsite development costs for possible industrial subdivisions, New Haven Correctional Institute site, Burnaby, 1999-2000.
- Canadian Pacific Railway, site servicing concepts and Proforma for offsite and onsite development costs for possible subdivisions, Kaleden, Merritt, Paldi, Port Coquitlam, Pitt Meadows, Abbotsford, Vancouver, 1995 – 2000
- Colliers Macaulay Nicolls, site servicing concepts and Proforma for offsite and onsite development costs 480 acre industrial subdivisions, Richmond, 1999
- Colliers Macaulay Nicolls, site servicing concepts and proforma for offsite and onsite development costs for possible 10 to 20 lots industrial subdivisions, Burnaby Women's Correctional Institute site, Burnaby, 1997
- Sheridan Hill Development Group, site servicing concepts and proforma for offsite and onsite development costs for 300 lot residential subdivision, Sheridan Hill, Pitt Meadows, 1997 – 1999
- Operating Engineers Pension Plan 120 unit Residential Development Project, Haney By-Pass, Maple Ridge, BC, – 1997
- British Columbia Buildings Corporation, site servicing concepts and proforma for offsite and onsite development costs for possible industrial subdivisions, New Haven Correctional Institute site, Burnaby, 1999-2000.
-
Pumping Facilities
- The Rainbow Joint Venture – Offsite Sanitary Sewers - Predesign Report, Offsite Sanitary Sewers – Sanitary Forcemain Design, Sanitary Pump Station Design Design and Contract Administration for construction of 3500 metre long 355 mm diameter DR 11 HDPE sanitary forcemain and 55 l/sec sanitary pump station, , 2008-2009Construction Value $2,300,000
- Directional Mining & Drilling Ltd. HDD pipe calculations including drillpath design for GVRD 420 metre long 1015 mm diameter DR 13.5 HDPE Jervis Forcemain No. 2, 2006-2008 Construction Value $3,500,000
- Directional Mining & Drilling Ltd. Hydraulic design calculations including confirmation of size and capacity for GVRD Jervis Forcemain No. 2, GVRD Jervis 1260 l/s Pump Station, 2006-2007.
- Nexus Construction – design of onsite sanitary pump station redeveloped residence at 3360 W 53RD, Vancouver, 2005.
- Purewal Blueberry Farms, Design and construction inspection of 70 l/s storm pump station and 2 12 l/s sanitary pump stations, Purewal Blueberry Farms, 2002
- Canadian Pacific Railway Design of reconstruction of 2 – 25 l/s pump station, Songhees Yard, Victoria, 2001
- P. Baratta Construction Ltd., Design-Build of 56 l/s intake pump station and chlorination / 25 l/s booster pump station for municipal water system, Harrison Hot Springs, 1999 – 2000.
- Pelton Reforestation Ltd. (design of 4.4 l/s sanitary pump station and forcemain for new lunchroom facility.), Maple Ridge, 1999
- Meadows Family Amusement Centre and Meadows Golf and Baseball Centre, Pitt Meadows (design of 2 pump stations 5.4 l/s and 4.1 l/s and 0.5 km forcemain to tie into municipal sanitary sewer, Pitt Meadows, 1998
- Pitt Meadows Golf Club (design of 2 pump stations 1.6 l/s and 2.0 l/s and 1.5 km forcemain to tie into existing private line owned by Purewal Blueberry Farms Ltd.), Pitt Meadows, 1998
- Purewal Blueberry Farms Ltd. (design-build of 4 pump stations 1 at 3.8 l/s and 3 at 1.3 l/s including 3.2 km forcemain to tie into existing Pitt Meadows municipal sewer), Pitt Meadows, 1997
- Sunridge Plateau, (water booster pump station redesign and commissioning, and final acceptance), Whistler, 1997
-
Infrastructure Renewal & Trenchless Technology
- Focus Corporation. Sanitary Sewer Assessment and Rehabilitation (assess, evaluate 51,000 meters of Sanitary Sewers), Township of Esquimalt, 2004 – 2008
- Canadian Pacific Railway, Sentinel Road Storm Sewer Upgrading, design and contract administration of 30 metres of 600 mm diameter pipe replacement located at Mile 0.8 Ioco Spur in the City of Port Moody, Canadian Pacific Railway, 2007
- Directional Mining & Drilling Ltd. HDD pipe calculations including drillpath design for GVRD Jervis Forcemain No. 2, 2006-2007.
- B & B Contracting Ltd., Trenchless pipe designs for pipe lining system for various municipal tenders, 2000-2006.
- Mar-Tech Underground Services Ltd., Trenchless pipe designs for pipe lining system, 2000-2006
- Insituform Technologies Ltd., CIPP pipe liner designs for various municipal tenders, 2001-2005
- Aplin & Martin Consultants Ltd., Review pre and post construction video inspection tapes of existing sanitary sewers to identify sewer condition before and after adjacent building foundation excavation. Slough Estates, Burnaby, 2001.
- Directional Mining & Drilling Ltd. HDD pipe calculations including Internal Pressure Stress and Bending Stress calculations, Thermal Stress, Equivalent Net Axial Tensile Stresses, Stresses from sustained loads, and Short Term and Long Term External Differential Pressures for various HDD tenders including 5 km of 500 mm (Fraser Port – Richmond), 500 m 300 mm diameter (Kamloops – Neskonlith IR), 2001.
- EBA Engineering Ltd, Design and technical specifications for GVRD Willingdon Trunk Sliplining Project, 150 meters of 40 inch PVC slipliner, 2001
- P. Baratta Construction Ltd. & PW Trenchless Construction Ltd. HDD pipe calculations including Internal Pressure Stress and Bending Stress calculations, Thermal Stress, Equivalent Net Axial Tensile Stresses, Stresses from sustained loads, and Short Term and Long Term External Differential Pressures for various HDD tenders, including 1.5 km of 500 mm (Mitchell Island– Richmond), 2001
- PEC, Inc. Ltd., CIPP pipe liner designs for various municipal tenders, 2001
- R. F. Binnie & Associates Ltd, Technical Specification and drawing review for pipe bursting of 250 meters of 400 mm to 530 mm sanitary trunk, District of Pitt Meadows, 2001.
- Seacor Environmental Ltd, Contract Administration and inspection during installation of 140 meter long 100 mm diameter horizontal well by HDD, Chevron Refinery, Burnaby, BC, 2001
- Southern Railway of British Columbia, design and technical specifications for segmental PVC sliplining of 150 meters of 1000 mm diameter Trapp Yard (wood stave) storm sewer, 2001
- Southern Railway of BC, Design and Contract Administration of Sliplining of 120 meter section of 48 inch wood stave pipe under 28 sets of active tracks using 42 inch Lamson Vylon PVC slipliner, 2001
- Highland Valley Copper Sanitary Sewer Assessment (assess, evaluate Sanitary Sewers), Logan Lake, 2000
- P. Baratta Construction Ltd., Design drawing for staging of directional drilling construction tender, City of Vancouver, 2000.
- R. F. Binnie & Associates Ltd. Sanitary Sewer Assessment and Rehabilitation (assess, evaluate Sanitary Sewers), City of Abbotsford, 1999
- SEG Engineering Ltd., Sanitary Sewer Assessment and Rehabilitation (assess, evaluate Sanitary Sewers), City of Winnipeg, 1999
- Reid Crowther & Partners Ltd. Sanitary Sewer Assessment and Rehabilitation (assess, evaluate Sanitary Sewers), Township of Esquimalt, 1996
- Crown Packaging Ltd. Sanitary and Storm Sewer Assessment and Rehabilitation (assess, evaluate, and rehabilitate Storm and Sanitary Sewers), Burnaby Recycling Facility, 1995 – 1996
- BCIT, Burnaby Campus, Assessment, Evaluation and Contract Document Preparation for renewal of 400 meters of 250 and 300 mm Sanitary Sewer (Fold and Formed), October 1994.
- Chevron Canada Limited, Burnaby Refinery, design, and contract administration for internal replacement of 100 meters of 300 mm diameter oily water sewer using Ultraliner Fold & Form PVC liner.
- Purewal Blueberry Farms, Installation of 1100 meters of 300 mm diameter dedicated fire line by Horizontal Directional Drilling, Pitt Meadows Plant, 2002
- Focus Corporation. Sanitary Sewer Assessment and Rehabilitation (assess, evaluate 51,000 meters of Sanitary Sewers), Township of Esquimalt, 2004 – 2008
-
Land Development
- Kiwanis Seniors Housing Society of West Vancouver, Phase II & III Onsite and Offsite improvements for redevelopment of Seniors Housing Facility, West Vancouver, 2006., Port Coquitlam, 2005-2006.
- Syndicat Management, Design of underground electrical service for information sign, Shaughnessy Station, Port Coquitlam, 2006.
- Taina Gateway 1 Site / Lot 93 and Lot 118, Onsite and Offsite improvements for redevelopment, Squamish BC. 2006.
- Arms Pub, Offsite improvements for new liquor retail outlet, Port Coquitlam, 2004-2005
- Canadian Pacific Railway, design of 10.3 acre 4 lot Oxford Village commercial subdivision, Port Coquitlam, 2004 – 2005
- Charles P. Development Corp, 22 lot residential subdivision, Coquitlam, 2004 – 2005
- Canadian Pacific Railway, Design of storm outfall relocation, East Yards, Port Coquitlam, 2001
- Aqua-Pak Styro Containers Ltd., Site services for new warehouse facility (including onsite oil water interceptors, stormwater detention tank and controls structure), Surrey, 2000
- Goodbrand International Inc. Site services for new office facility, Langley, 2000
- Jakin Construction Ltd, Design of Parking lot and onsite servicing for new residence including onsite storm and sanitary pump stations, Vancouver, 2000
- Operating Engineers Pension Plan 50 unit Townhouse Development Project, Haney By-Pass, Maple Ridge, BC, – 2000
- Pacific Coast Terminals, Design of parking lot grading and site servicing for new Guardhouse Facility, 2000
- Brighton Beach Properties, Design of onsite sanitary sewer system for existing subdivision, North Vancouver, 1999
- Canadian Pacific Railway, subdivision design and processing, Kaleden, and Port Coquitlam, BC, 1999, 2000
- Irmandade Portuguesa Do D.E. Society, Site services for new assembly hall, Surrey, 1999
- Rivtow Marine Ltd., Design of Container lot grading and subdrainage system for Delta Container Site, 1999
- Sterling Crane Ltd, Site services for new maintenance facility, Coquitlam, 1999
- Charcor Developments Ltd., 80 acre 15 lot Residential Development, Sumas Mountain, Abbotsford, 1995, 1998
- LaRose – Morton, 14 lot subdivision, Maple Ridge, 1997 – 98
- Pacific Coast Golf Centre, Design of Parking lot and onsite servicing for new Golf Centre, Richmond, 1998
- Polonez Developments Ltd.– 7 lot subdivision, Maple Ridge, 1997 – 1998
- J.S. Jones Timber Ltd., Pitt lake Watchman's House Sewage System, 1997
- Gill, Gill, and Sidhu, 3 lot Subdivision, Surrey, 1996
- Overwaitea Head Office Building (site servicing), Langley, 1996
- Taina Developments (Deer Brook) Ltd., Construction Management of Deer Brook Subdivision, 24 lot subdivision, Burnaby, 1996 to date
- Chergar Developments Inc., 60 acre 40 lot Residential Development, Sumas Mountain, Abbotsford, BC. , 1995
- Kiwanis Seniors Housing Society of West Vancouver, Phase II & III Onsite and Offsite improvements for redevelopment of Seniors Housing Facility, West Vancouver, 2006., Port Coquitlam, 2005-2006.
-
Roadworks & Miscellaneous
- Fraser Cedar., Cedar Shake Processing Facility Access Improvements, Design of access improvements to Cedar Shake Processing Facility, from Lougheed Highway, Maple Ridge, BC, 2006
- Construction Aggregates Ltd., Watts Point Foreshore Road, Design of 1.0 km access road to gravel pit from Highway 99, Squamish, BC, 2001
- Coquitlam Ridge Construction Ltd. Traffic Control Plan for Construction of Mary Hill Bypass Pedestrian Bridge, Design of traffic control plan on Mary Hill Bypass, Port Coquitlam, BC 2001.
- Construction Aggregates Ltd., Watts Point Access Road, Design of 1.0 km widening, channelization, and new access road to gravel pit from Highway 99, Squamish, BC, 1998, 1999, 2000
- Coquitlam Ridge Construction Ltd., Traffic Control Plan for Furry Creek South Bridge No. 1465 Reconstruction, Design of traffic control plan on Highway 99, Furry Creek, BC, 2000
- Northview Enterprises Ltd., Log sort Access Improvements, Design of widening, channelization, and access improvements to Log sort facility from Haney Bypass, Maple Ridge, BC, 2000
- Taina Developments (10), (13), (14), (15) AND (23) Ltd., Subdivision Processing, Proforma, Budget and house construction cost control, Sunridge Plateau, Whistler, 1996 -98
- Fraser Cedar., Cedar Shake Processing Facility Access Improvements, Design of access improvements to Cedar Shake Processing Facility, from Lougheed Highway, Maple Ridge, BC, 2006